factory low price Double Sided Smt Assembly - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast
factory low price Double Sided Smt Assembly - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast Detail:
PRODUCT SPECIFICATION:
Base Material: | FR4-TG140 | Surface Finish: | HASL(Lead Free) |
PCB Thickness: | 1.6mm | Solder Mask: | Green |
PCB Size: | 60*92mm | Silkscreen: | White |
Layer Count: | 2/L | Cu Thickness | 35um(1oz) |
Mounting Type: | SMT+DIP | SMT Package | 0201,BGA |
Application | Industrial Controller |
Lower Your Cost
Turnkey PCBA Assembly; BOM Solution To Reduce The Cost; Professional Advice For Your Design Optimization
Quality Assurance
ISO9001&UL Certificated; 100% AOI/E-Testing/X-ray Programming&Function Test Before Output;
On Time Delivery
Real-time Order Status Update; Transparent Production Orocess Step; 99% On-time Shipping By DHL/UPS/FeDex/TNT;
Best Customer Service
24 Hours Online; Timely After-sales Feedback In 12 Hours; Professional Technical Support;
PCB Boards:
Our products covers 1-32Layer Rigid PCB; Flexible PCB; Rigid-flex PCB; HDI PCB; Gold-Plated PCB; High Frequency PCBs; Aluminum PCB; Copper Base Circuit Board; High TG PCB; Heavy Copper PCB as well as PCB assembly service.
PCB Assembly Boards:
PCB/PCBA Production Lead Time:
Layers | Sample | First order | Repeat Order |
Single Sided | 3 days | 7 days | 6 days |
Double Sided | 4 days | 8 days | 7 days |
4 Layers | 7 days | 9 days | 8 days |
6 Layers | 8 days | 10 days | 9 days |
8 Layers | 10 days | 12 days | 10 days |
10 Layers | 12 days | 14 days | 12 days |
Aluminum Base | 3 days | 8 days | 7 days |
FPC Single Sided | 5 days | 8 days | 8 days |
FAQ :
Q: What files do you use in PCBA fabrication?
A: Gerber or Eagle, BOM listing, PNP and Components Position
Q:Is it possible you could offer sample?
A: Yes, we can custom you sample to test before mass production
Q: When will I get the quotation after sent Gerber, BOM and test procedure?
A: Within 6 hours for PCB quotation and around 24 hours for PCBA quotation.
Q: How can I know the process of my PCBA production?
A: 7-10 days for PCB production and components purchasing, and 10 days for PCB assembly and Testing
Q: How can I make sure the quality of my PCBAs?
A: We ensure that each piece of PCBA products work well before shipping. We’ll test all of them according to your test procedure. Also if there are any defect items during the shipping, we also can be free to repair for you.
Product detail pictures:
Related Product Guide:
All we do is often involved with our tenet " Purchaser to start with, Rely on initially, devoting over the food stuff packaging and environmental defense for factory low price Double Sided Smt Assembly - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast, The product will supply to all over the world, such as: Moscow, Russia, Malaysia, What is good price? We provide customers with factory price. In the premise of good quality, efficiency must be paid attention to and maintain appropriate low and healthy profits. What is a fast delivery? We make the delivery according to customers' requirements. Although delivery time depends on the order quantity and the complexity of it, we still try to supply products in time. Sincerely hope we could have long term business relationship.
By Clementine from Argentina - 2017.06.22 12:49
It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
By Lisa from Bangkok - 2018.02.12 14:52