Low price for Pcb Sub Assembly - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast
Low price for Pcb Sub Assembly - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast Detail:
PRODUCT SPECIFICATION:
Base Material: | FR4-TG140 | Surface Finish: | HASL(Lead Free) |
PCB Thickness: | 1.6mm | Solder Mask: | Green |
PCB Size: | 60*92mm | Silkscreen: | White |
Layer Count: | 2/L | Cu Thickness | 35um(1oz) |
Mounting Type: | SMT+DIP | SMT Package | 0201,BGA |
Application | Industrial Controller |
Lower Your Cost
Turnkey PCBA Assembly; BOM Solution To Reduce The Cost; Professional Advice For Your Design Optimization
Quality Assurance
ISO9001&UL Certificated; 100% AOI/E-Testing/X-ray Programming&Function Test Before Output;
On Time Delivery
Real-time Order Status Update; Transparent Production Orocess Step; 99% On-time Shipping By DHL/UPS/FeDex/TNT;
Best Customer Service
24 Hours Online; Timely After-sales Feedback In 12 Hours; Professional Technical Support;
PCB Boards:
Our products covers 1-32Layer Rigid PCB; Flexible PCB; Rigid-flex PCB; HDI PCB; Gold-Plated PCB; High Frequency PCBs; Aluminum PCB; Copper Base Circuit Board; High TG PCB; Heavy Copper PCB as well as PCB assembly service.
PCB Assembly Boards:
PCB/PCBA Production Lead Time:
Layers | Sample | First order | Repeat Order |
Single Sided | 3 days | 7 days | 6 days |
Double Sided | 4 days | 8 days | 7 days |
4 Layers | 7 days | 9 days | 8 days |
6 Layers | 8 days | 10 days | 9 days |
8 Layers | 10 days | 12 days | 10 days |
10 Layers | 12 days | 14 days | 12 days |
Aluminum Base | 3 days | 8 days | 7 days |
FPC Single Sided | 5 days | 8 days | 8 days |
FAQ :
Q: What files do you use in PCBA fabrication?
A: Gerber or Eagle, BOM listing, PNP and Components Position
Q:Is it possible you could offer sample?
A: Yes, we can custom you sample to test before mass production
Q: When will I get the quotation after sent Gerber, BOM and test procedure?
A: Within 6 hours for PCB quotation and around 24 hours for PCBA quotation.
Q: How can I know the process of my PCBA production?
A: 7-10 days for PCB production and components purchasing, and 10 days for PCB assembly and Testing
Q: How can I make sure the quality of my PCBAs?
A: We ensure that each piece of PCBA products work well before shipping. We’ll test all of them according to your test procedure. Also if there are any defect items during the shipping, we also can be free to repair for you.
Product detail pictures:
Related Product Guide:
We provide good power in high-quality and progress,merchandising,revenue and internet marketing and operation for Low price for Pcb Sub Assembly - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast, The product will supply to all over the world, such as: Lisbon, Jeddah, Finland, As an experienced factory we also accept customized order and make it same as your picture or sample specifying specification and customer design packing. The main goal of the company is to live a satisfactory memory to all the customers, and establish a long term win-win business relationship. For more information, please contact us. And It is our great pleasure if you like to have a personally meeting in our office.
By Chloe from Peru - 2018.11.06 10:04
A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
By Wendy from Estonia - 2017.04.08 14:55