OEM China Electronic Assembly Manufacturing - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast
OEM China Electronic Assembly Manufacturing - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast Detail:
PRODUCT SPECIFICATION:
Base Material: | FR4-TG140 | Surface Finish: | HASL(Lead Free) |
PCB Thickness: | 1.6mm | Solder Mask: | Green |
PCB Size: | 60*92mm | Silkscreen: | White |
Layer Count: | 2/L | Cu Thickness | 35um(1oz) |
Mounting Type: | SMT+DIP | SMT Package | 0201,BGA |
Application | Industrial Controller |
Lower Your Cost
Turnkey PCBA Assembly; BOM Solution To Reduce The Cost; Professional Advice For Your Design Optimization
Quality Assurance
ISO9001&UL Certificated; 100% AOI/E-Testing/X-ray Programming&Function Test Before Output;
On Time Delivery
Real-time Order Status Update; Transparent Production Orocess Step; 99% On-time Shipping By DHL/UPS/FeDex/TNT;
Best Customer Service
24 Hours Online; Timely After-sales Feedback In 12 Hours; Professional Technical Support;
PCB Boards:
Our products covers 1-32Layer Rigid PCB; Flexible PCB; Rigid-flex PCB; HDI PCB; Gold-Plated PCB; High Frequency PCBs; Aluminum PCB; Copper Base Circuit Board; High TG PCB; Heavy Copper PCB as well as PCB assembly service.
PCB Assembly Boards:
PCB/PCBA Production Lead Time:
Layers | Sample | First order | Repeat Order |
Single Sided | 3 days | 7 days | 6 days |
Double Sided | 4 days | 8 days | 7 days |
4 Layers | 7 days | 9 days | 8 days |
6 Layers | 8 days | 10 days | 9 days |
8 Layers | 10 days | 12 days | 10 days |
10 Layers | 12 days | 14 days | 12 days |
Aluminum Base | 3 days | 8 days | 7 days |
FPC Single Sided | 5 days | 8 days | 8 days |
FAQ :
Q: What files do you use in PCBA fabrication?
A: Gerber or Eagle, BOM listing, PNP and Components Position
Q:Is it possible you could offer sample?
A: Yes, we can custom you sample to test before mass production
Q: When will I get the quotation after sent Gerber, BOM and test procedure?
A: Within 6 hours for PCB quotation and around 24 hours for PCBA quotation.
Q: How can I know the process of my PCBA production?
A: 7-10 days for PCB production and components purchasing, and 10 days for PCB assembly and Testing
Q: How can I make sure the quality of my PCBAs?
A: We ensure that each piece of PCBA products work well before shipping. We’ll test all of them according to your test procedure. Also if there are any defect items during the shipping, we also can be free to repair for you.
Product detail pictures:
Related Product Guide:
To be a result of ours specialty and service consciousness, our enterprise has won an excellent status between buyers all around the globe for OEM China Electronic Assembly Manufacturing - Industrial Electronic PCB Manufacture, SMT&THT Assembly Service – PhiliFast, The product will supply to all over the world, such as: Argentina, Mecca, London, Our company always concentrate on the development of the international market. We now have a lot of customers in Russia , European countries, the USA, the Middle East countries and Africa countries. We always follow that quality is foundation while service is guarantee to meet all customers.
By Pearl Permewan from Auckland - 2017.06.25 12:48
The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
By Andrew Forrest from Salt Lake City - 2017.03.28 16:34